Energy Invest Holding CJSC is pursuing a number of projects in the renewable energy sector. There was a first utility-scale pilot 0.5 MW solar photovoltaic power plant (SPP) constructed in Hrazdan back in October 2017. The preparations for building a larger SPP are underway. The company is in a preparatory phase for constructing a Shnogh hydroelectric power plant (HPP) on Debed river in the Lori Marz with an installed capacity of 76 MW. The preparations for building a Waste to Energy plant with a 10 MW installed capacity in the premises of the Hrazdan Thermal Power Plant are also underway. Alongside this, the company acquires and manages small hydro power plants all over the Armenia.